This is the last construction photos before the roof installation, as then construction will be finished!
January this year was particularly cold and began with snow, which also showed us evidence of the users of the field, rabbits. The later part of the month was sunny but still cold.
In March the vegetation was growing steadily once more. What did happen frequently is that the parts of the roof where the rock covering was removed had some standing water on it. Other than that, the site is now prepared for green roof installation and easily accessible through the staircase. What's more, we received a leftover furniture piece to showcase the different layers of the green roofs on the ground floor, in case anyone cannot access the roof itself.