Friday, December 20, 2024

LILa construction October-December 2024

Now that the paths are constructed, the final electricity connections need to be connected to aboveground access points. Visually the terrain looks much the same in this period.

 





 

No comments:

Post a Comment

Results thermal walks Hengelo

Last May two thermal walks were conducted with participants in Hengelo to test five different locations where the municipality has implement...