Most of the work these months involved the large underground cables and pipes segment of my colleague Leon Olde-Scholtenhuis. Here students and other trainees can learn to use the Ground Penetrating Radar and analyse which pipes and cables are located where in the subsurface. As this requires heavy machinery and heavy materials on the terrain, the main paths are not yet finalized.
Friday, June 28, 2024
LILa construction April - June
Subscribe to:
Post Comments (Atom)
Poster for the UT Field Lab on Green Infrastructure
This overview poster shows the positioning of each sensor so far for our green infrastructure project at the UT Field Lab:
-
Every May 24 it is European Day of Parks . It is "a commemorative day for Protected Areas across Europe that was launched in 1999 by t...
-
This post contains all the information from previous walk-shops organized at University Twente. Click on the links below to learn more. Cont...
-
After years of preparation, the UT Field Lab will open in about a month! "On Thursday afternoon, 2 October, we’re officially opening th...







No comments:
Post a Comment